As part of a £15 million pound school facelift, Module-AR Limited were awarded with the contract to provide temporary buildings & teaching accommodation to house Music, Art, History, RE as well as Music Rehearsal Rooms and Temporary Office Space for Staff.
To assist with the acoustic levels to both the Music Rooms and Rehearsal Spaces the internal walls to these areas were designed to achieve a higher dB reduction.
The 950m2 single storey temporary building was designed to accommodate 300 pupils for a period of 18 months. Upon opening of the new facility there was a real buzz by pupils and staff who were all very excited and really loved the new temporary classrooms.
The temporary building was a resounding success drawing quotes from Head Teacher, Danuta Tomasz:
“The temporary building is a proper school, it has just moved us into a different place. It makes it a safer, happier place for students”.
“Step inside our temporary classrooms which are now in situ at the Boothferry Road side of the school and be transported into a modern, bright and hi-tech world of education”.
Jill Bristow (School Business Manager) explains:
“Everyone who has seen the new block has been impressed with the overall quality and the facilities it provides. It was critical to the success of our refurbishment programme that the modular buildings arrived out of hours so minimal disruption was caused. Timely delivery was absolutely essential and the service by Module-AR was first-rate with all the modules being delivered exactly when needed. The portable buildings have been specifically designed to provide a high-quality teaching environment with good ventilation and excellent energy efficiency as well as high levels of natural light. In most cases the new classrooms are twice the size and a big improvement on our old ones“
![]()
| Project Details | |
|---|---|
| Project Size | 950 m2 |
| Modules | 27 |
| Factory Build | 4 weeks |
| Installation | 2 Days |
| Completion | 3 weeks |