Leading supplier of Modular & Portable Buildings serving a variety of building solutions
HIRE and SALE of high quality Modular Buildings offering both Temporary and Permanent Solutions
Read all about our completed projects and solutions with a variety of clients
Health & Safety is of paramount importance to us. Take a look at our Accreditations
Have a question or a general query? You can contact us in a number of different ways
When Sheffield became the tenth local authority to sign a contract for its BSF project to rebuild, refurbish and upgrade secondary schools throughout the city, the £400 million investment programme also needed to refurbish High Storrs School, a Grade II Listed Building which has Performing Arts School status.
To enable High Storrs School to be refurbished, high quality portable building facilities were required to house the specialist classrooms such as 2 fully fitted out Food Technology Classrooms and associated preparation room and stores, a Dance Studio, Drama Rooms, Changing Facilities, Art Rooms, Staff Office and Relaxation Room.
Module-AR Limited were selected to become Sheffield LEP / Taylor Woodrows Key Supply Chain Partner to design and install the specialist portable classroom buildings. The overall temporary building arrangement was specifically designed to enable both conversion into Science Laboratories at a later date and future expansion. The portable buildings were split into two individual blocks covering an overall footprint of 1435m2.
Mike Chapman (Headteacher) comments:
“We would like to thank the team at Module-AR for providing our school with excellent specialist teaching accommodation over the course of the summer”
“The quality of the portable buiding is of an exceptionally high standard, and our students are already reaping the rewards of studying in theses clean, bright temporary spaces”
![]()
| Project Details | |
|---|---|
| Project Size | 1435 m2 |
| Modules | 43 |
| Factory Build | 6 weeks |
| Installation | 4 Days |
| Completion | 3 weeks |