Module-AR Limited are Achilles RISQS Accredited and we have a wealth of experience working with the Rail sector to provide modular solutions for a variety of needs.

We have worked on a range of projects including, but not limited to:

  • BIM Level 2
  • Specialist MDU facilities that are compliant with Network Rail corporate DNA.
  • Stylish bespoke Office Accommodation.
  • Functional Depot Welfare Facilities.
  • Train Driver Simulator Facilities.

Our single, double or multi-storey buildings are constructed in our state of the art factory to minimise on-site disruption. The variety of external claddings & internal finishes we can provide allow your building to be as functional and aesthetically pleasing as possible. Take a look through our selection of Rail projects below and get in touch if you require a Module-AR Limited temporary or permanent building solution.

Rail & Transport Case Studies

Rail & Transport
Park & Ride Facility - Temple Green, Leeds

Park & Ride Facility - Temple Green, Leeds

  • Client - Leeds City Council
  • Project size - 132m²
  • Completion - 13 weeks
  • Park & Ride Facility
  • Passenger waiting area, Ticket machines, Office & welfare facilities, secure ticket window, WC's and Baby change

The largest fully operational, modular building, Park & Ride, facility in Leeds at Temple Green, to further complement the existing facility, at Elland Road.

As with Elland Road, Temple Green is similar in design, boasting a feature clock tower, however, clad with Western Red Cedar wood, a fully heated passenger waiting area providing ticket machines and seating areas, WC’s, staff office, welfare facilities & a secure ticket window. The whole modular building consists of 6 no. Modules, totalling 132m2.

All the Park & Ride facilities, including the buses and routes, each have a distinct colour, to provide passengers with an easy, visual of destination routes. Temple Greens’ feature colour is a vibrant Orange, whilst Elland Road boasts bright Green.

This is the second of four park & ride facilities to date, which will play a vital role in the Transport Strategy for Leeds. This is the largest Park & Ride which accommodates 1000 car parking spaces. Park & Ride schemes will help to reduce the congestion and improve the city’s air quality so we are extremely pleased to be a chosen specialist contractor in this major transport strategy.

Words from the client

Councillor Richard Lewis, Leeds City Council’s executive board member for economy and development, said: “This scheme is both a milestone in the development of the Enterprise Zone and represents another step on the road to providing a network of park-and-ride sites across the city, easing congestion and cutting pollution in the centre.”

Why not  have a look at our other Rail & Transport case studies or get in touch for more information 

More
Park & Ride Facility - Temple Green, Leeds
Rail & Transport
Network Rail - Stockport

Network Rail - Stockport

  • Client - Network Rail
  • Project size - 2,186m²
  • Completion - 14 weeks
  • 2 Storey Office & Welfare Facility
  • Part Cedar & Part Kingspan External Cladding

Module-AR Limited were granted the project to design a 2,186m², 2 storey, 64 No. module Office and Welfare facility for Network Rail. The structure was designed & built to accommodate 132 Office staff with Welfare facilities for 240 staff at their Stockport branch.

This purchase building was finished externally with Plastisol (plastic coated steel) which was bonded to 9mm WBP exterior grade plywood. The plywood panel was fitted to a timber frame to form a stressed skin construction. The part Cedar and part Kingspan cladding chosen by Network Rail creates a modern & aesthetically pleasing structure.

The external windows of the Network Rail Stockport building are thermally broken PC Aluminium frames incorporating laminated & toughened glass, fitted with Trickle Vents to provide background ventilation. All windows can be opened and cleaned from the inside of the building, reducing the risk of falls from ladders as associated with external cleaning methods. The external doors of the building are manufactured from double skinned 1.2mm Zintec steel with interlocking seams and reinforced interlocking channels & tubes to prevent twisting.

The interior of the building was designed to meet Network Rail corporate DNA. This generates a creative and productive environment that is a pleasure to work in. On the ground floor of the fully Heat & Cool air conditioned building is a Briefing room, Meeting room, Archive room, with an enhanced 5kN/m² floor loading, 4 No. Offices, a large 216m² Refectory (with dishwashers, sinks, fridges & seating accommodation), a Store room, Switch room, male & female WC's and shower facilities, a 135m² Drying room, a 135m² Locker room, a Lobby with Reception area and a Security room. 2 No. corridors with stairwells and a DDA Compliant lift were installed to take employees to the first floor of the structure. The first floor features a huge 665m² open plan Office, 5 No. additional Meeting rooms, a Communications room, open plan fully-fitted Kitchen/Dining area, Casual Meeting space and male & females WC's.

In total the project was designed, manufactured and installed in just 14 weeks with dramatically reduced on site traffic and site disruption. This was extremely important to Network Rail as the building is situated next to a live railway.

More
Network Rail - Stockport
Rail & Transport
Park & Ride Facility - Elland Road, Leeds

Park & Ride Facility - Elland Road, Leeds

  • Client - Leeds City Council
  • Project size - 132m²
  • Completion - 13 Weeks
  • Park & Ride Facility
  • Passenger waiting area, Ticket machines, Office & welfare facilities, secure ticket window, WC's and Baby change

A brand new passenger facility at Elland Road Park and Ride, which was designed and installed by our expert team.

The 132m² facility comprises of a fully heated waiting area, passenger toilets, baby-changing facilities and ticket machines.

Module-AR Designed the modular building and manufactured all the components off-site, before installing it using a crane in just one day. Constructed from sustainable materials and clad with Perspex-backed brushed aluminium, this modular building exceeds all building regulations for thermal efficiency.

With over 700 cars parking at the Elland Road facility every weekday, Leeds City Council Leader Cllr Judith Blake said the new investment would encourage even more people to use the park and ride: “Our recent transport conversation survey shows the demand for more park and ride sites across the city is clearly there".

Cllr Blake continued: “The most popular method of public transport used in Leeds and across the Leeds City Region… bus services are central to our future transport strategy.”

West Yorkshire Combined Authority Transport Chair Cllr Keith Wakefield spoke of the many benefits of using off-site construction in a project like this: “The opening of this new passenger facility, ahead of schedule is just the latest benefit for people using the Elland Road Park and Ride to save themselves the cost and hassle of parking in Leeds city centre.”

He went on: “The new modular passenger facility is an impressive and smart building and manufacturing off-site has resulted in a range of benefits including quicker production times, assured quality, greater sustainability and reduced waste of materials.”

Modular buildings can be used across a wide variety of sectors including transport, healthcare, education and accommodation. For more information about our bespoke modular building solutions contact a member of our team today. With over 60 years’ experience, you can be sure our expert team can deliver an aesthetically pleasing project on time and budget.

We have now completed the 2nd modular build, passenger facility, in Leeds, click here to have a look.

Why not  have a look at our other Rail & Transport case studies or get in touch for more information 

More
Park & Ride Facility - Elland Road, Leeds

What our customers say

“Module-AR worked efficiently and communicated well with the school.They really wanted to understand what our needs were, and successfully met them.”
Woodhill Primary School
“Module-AR designed a building that followed our architects’ specification delivering a high quality and easy to maintain building which operates well for the Elland Road Park and Ride patrons. This structure improves the facilities available to users
Paul Hammer – Engineer, Leeds County Council.