Completed hire projects

Here at Module AR Limited, we are specialists when it comes to supplying temporary buildings for a variety of applications. Whether you are looking to hire, purchase or lease any of our modules, we have the capabilities to tailor a package specific to your needs. Suited for both single & multi-story facilities, with steel frames and an external cladding of Plastisol (plastic coated steel) you can be assured our buildings can be hired for any period of time, from a few weeks to a number of years, without quality issues arising. Our impressive selection of modular structures used in a variety of industries, coupled with our experienced expert in-house design team, means that hiring a Module-AR structure is often one of the most commercially viable and effective solutions.

PMC0072

Latest News

Turnham Primary School - Lewisham

Turnham Primary School, Lewisham, required a temporary School building to accommodate students whilst their existing buildings are redeveloped. Module-AR Limited secured the project to provide 5 No. Classrooms with WC's and a Hall for a period of 52 weeks.

read more
Parish CoE Primary School   Canopy EDIT FLOWERS

Latest News

Parish CoE Temporary Classrooms - Bromley

Parish Church of England Primary School is a 2 Form Entry Primary School for children between the age of 4-11 set in 5 acres of parkland on the outskirts of Bromley town centre. The mansion building housing much of the school dates back to 1770's and the school itself, which has previously occupied other sites is probably the oldest educational establishment in the borough, tracing its history back to 1717. The London Borough of Bromley were seeking to expand Parish CoE Primary School, in order to address the bulge of children coming in to the education stream, from a 2 Form of Entry to a 3 Form of Entry. Module-AR Limited were awarded the contract to demolish 4 No. existing dilapidated 'mobile' classrooms (including the controlled removal of asbestos) to make way for a new permanent purpose-built 12 No. Classroom facility. 8 No. Temporary Classrooms were also provided for the full duration, decanting pupils temporarily whilst the building work took place.

read more
Western Power Hereford   Office

Latest News

Western Power - Hereford

The Western Power Hereford site required temporary Office and Welfare Accommodation for their staff to use for 18 months. The 24 No. module project with a footprint of over 730m² was awarded to Module-AR Limited due to our experience in the Utilities, Waste & Petrochemical market sector and our enviable reputation for providing first class customer service.

read more
Vermuyden High School   Art Room

Latest News

Vermuyden High School - Goole

As part of a £15 million pound school facelift, Module-AR Limited were awarded with the contract to provide temporary modular buildings & teaching accommodation to house Music, Art, History, RE as well as Music Rehearsal Rooms and Temporary Office Space for staff at Vermuyden High School, Goole. The 950m² single storey temporary building was designed to accommodate 300 pupils for a period of 18 months.

read more
Biffa Waste Office Facility   St Helens

Latest News

Biffa Waste Office Facility - St Helens

Biffa is the leading nationwide integrated waste management business providing collection, treatment, recycling and technologically-driven energy generation services. The St Helens branch of Biffa required a 52 week hire building to be used as Office Accommodation and Site Welfare. Module-AR Limited were granted the contract and 6 No. AR3000 units were designed, manufactured and installed to completed the single storey building.

read more
High Storrs School FTech Science

Latest News

High Storrs School - Sheffield

When Sheffield became the tenth local authority to sign a contract for its BSF project to rebuild, refurbish and upgrade Secondary Schools throughout the city, the £400 million investment programme also needed to refurbish High Storrs School, a Grade II Listed Building which has Performing Arts School status.

read more

What our customers say

“Module-AR worked efficiently and communicated well with the school.They really wanted to understand what our needs were, and successfully met them.”
Woodhill Primary School
“Module-AR designed a building that followed our architects’ specification delivering a high quality and easy to maintain building which operates well for the Elland Road Park and Ride patrons. This structure improves the facilities available to users
Paul Hammer – Engineer, Leeds County Council.

© Module-AR Limited 2017. Registered in England #01234567 Website designed and built by indicoll
Privacy Policy Cookie Policy Disclaimer Accessibility Modern Slavery Statement